top of page
All Posts
Fiberglass video 2.
Here hopefully is a short video showing how I will be laying up my fiberglass. Fiberglass
tongeady89
May 201 min read
Fiberglass has started
This is a quick post about fiberglassing my hull.I've done the transom and now ready to start the the hull.😬😁👍 Fiberglass
tongeady89
May 191 min read
Planking finished
Apart from a bit if trimming and filling. Glass next.😁😁🍾 She is coming along nicely.
tongeady89
Apr 201 min read
Hull Planking
Quick update from the tent.
tongeady89
Apr 61 min read


Hull Planking.
I've started planking the hull with 9mm ply. I started off with the transom then added the first of the bottom. Which is 1 full sheet cut to the shap of the hull. To get the hull shape I lay the sheet on top popped a couple of screw in at the stern to hold it still then drilled pilot holes every 125mm and used a measuring stick to get the distance from the edge of the sheet to the stringer underneath. Once happy the hole where in the right place I joined the holes with pen li
tongeady89
Apr 51 min read
Stringers
All the Stringers glued in. Planking next.
tongeady89
Mar 181 min read
Keel floors and Stringers
So I've been busy in tent fittong the 4 Oak Keel timbers and fitting the Stringers. Loads of work/time on the frames to get the Stringers in. I've used a Makita Multi tool for the job it make cutting out the frames to receive the stringers easy. The blades are a bit expensive but it saves loads of time and effort. They have all been Epoxyed in useing the 2 stage method(wetting out with Epoxy then thickend Epoxy to fill and glue the joints) with West System slow drying Epoxy.
tongeady89
Mar 181 min read


Stringers
So I've started cutting into the frames to take the stringers. This is taking some time, 7 frames and 10 stringers thats 70 individual joints and that doesn't count the keel floors. So a couple of days work with a circular saw and a Combi Tool which is a god send, the blades are expensive but the tool is worth the cost as it makes very presice cuts without shaking and shocking the jig with a malet and chissel.
tongeady89
Mar 11 min read


Frames going on the Strong back
This process is quite straight forward. Lots of measuring and consulting the plans. You do need to brace all the frame both fore and aft but also athwartships. A box of 80mm and 40mm wood screws and some pallets from a neighbours house for some free timber and a bit of ingenuity and job done.
tongeady89
Mar 11 min read


Strongback almost finished.
Back in the tent So my frames are done and it's time move to stage 2. It feels like a mile stone has been reached. The timber for it I got from a builders merchant in our town 5 meters long [8x2] 200x50 and some [3×2] 75x50mm and a box of 80mm screws cost £120. Its taken me about 8 hours over two days. Its square and level but the uprights need support. Before I started putting it together I had to do a bit of space creation that revealed that I'd have a guest during the win
tongeady89
Feb 91 min read


Heavy Weather
This video was from November 25, 1 1/2 months into the build.
tongeady89
Feb 21 min read


Delivery
So this lot is from October 25. A big tent and the ply.
tongeady89
Feb 11 min read


Melady #291
A bit about me.
tongeady89
Feb 11 min read


#291
More Frame stuff. A bit a Framing.
tongeady89
Feb 11 min read


My frames are all done.
All frames finished
tongeady89
Feb 12 min read


Frame B
Frame C epoxy glue up
tongeady89
Nov 28, 20251 min read
291 Melady
This is the start of my adventure. I'm building a plywood box in the back garden and I'm going to sail it across an Ocean. The concept came from Don Mcintyre and 11 of these 19 foot (5.8 meter) sail boats are racing round the bottom of South Africa after sailing 21000 miles from Antigua.
tongeady89
Nov 19, 20251 min read
bottom of page

